Fire Station 20
Commercial2024·Florida

Fire Station 20

Project Scope

Structural steel framing to support living quarters above, with steel trusses and metal decking to provide the roof structure over the engine bay.

Technical Challenge

Coordinating the transition between the living quarters framing above and the wide-open engine bay below required careful attention to load paths and connection geometry to maintain clear span over the apparatus floor.

Outcome

Full structural steel package delivered for the living quarters support framing and engine bay roof system, providing a durable, code-compliant structure for the station.

Software & Tools

Tekla Structures

Project Gallery

Fire Station 20 exterior showing structural steel trusses and decking over engine bay entrance
Fire Station 20 engine bay interior showing painted steel trusses and metal decking with three apparatus bays
Fire Station 20 engine bay interior with steel trusses and metal decking viewed from apparatus floor
Fire Station 20 engine bay interior showing red structural steel trusses and corrugated metal roof decking under construction

4 items

Project Specifications

Steel Tonnage

Project Area

Stories / Height

2 stories

Shop Drawings

Location

Florida

Completed

2024